When a beverage plant alternates glass and PET, start with the actual container drawings and the planned production calendar. Confirm where each package enters the line and where they first share equipment. Add the pallets and auxiliary services available at the site for each run.
Map one representative week
Mark which modules work with both formats, which require different parts and which are dedicated to one package. Give the seller two run examples showing duration, output and the change scheduled between them. Ask the supplier to identify what it has already demonstrated and what needs a witnessed trial.
| Interface | Glass run | PET run |
|---|---|---|
| Empty container feed | ___ | ___ |
| Support through filling and closing | ___ | ___ |
| Labelling and case handling | ___ | ___ |
| Pallet and changeover evidence | ___ | ___ |
Run the weekly plan against warehouse appointments. If inbound PET and outbound finished glass require the same door during a two-hour window, mark the scheduled moves on the plan. Ask the site to confirm which arrivals can be shifted. That choice may determine whether separate buffer lanes are worth including in the equipment proposal.
Read the Portuguese guide to identifying the line’s actual modules
Check the PET-specific parts of the process
Discuss a line for both packaging routes
Share the two drawings, intended location, daily schedule and target rate.